Determined to find a better privy design, and a more humane solution of collecting waste, NPS collaborated with ColoradoBuildingWorkshop to re-design and constructed four new backcountry privies. The new Long’s Peak Privy locations vary in elevation from 10,500 ft. to almost 13,000 feet above sea level. They explore lightweight prefabricated construction and emerging methods of waste collection to minimize the human footprint in Colorado’s backcountry. The final design solution is a series of prefabricated structural gabion walls.
Within the gabions, a series of thin steel plate moment frames triangulate the lateral loads within the structure while stones, collected on-site, are used as ballast. This innovative construction assembly allows for rapid on-site construction (the project was erected in eight days) and an architecture that disappears into the surrounding landscape. Credits: Gloren Roper, Selena Obelinas, Greg Hise, Robby Cuthbert, David Wallmueller, Jillian Pate, Aleksi Vuola, Andy Paddock, Grant Johnson, Leah Fett, Will Koning ColoradoBuildingWorkshop, CU Denver, Taylor Carlisle, Ben Ludeman, Cate Humby, Matt Rivera, Collin Bailey, Marc Daubert, Morgan Marzo, Brian Duncan, Brittany Goldsmith, David Cincotta, Austin Gohl, Kate Farrington, Intan Yokelson, Erik Sommerfeld ColoradoBuildingWorkshop, CU Denver, Leah Gordon, Riley Barber Credits: - Kate Farrington - Selena Obelinas - Structural Engineer - Andy Paddock - Collin Bailey - Cate Humby - Robby Cuthbert - Leah Gordon - Intan Yokelson - Aleksi Vuola - Morgan Marzo - ColoradoBuildingWorkshop, CU Denver - Assistant Professor, Director - Erik Sommerfeld - Gloren Roper - Riley Barber - David Cincotta - Greg Hise - Austin Gohl - Leah Fett - David Wallmueller - ColoradoBuildingWorkshop, CU Denver - Bixler Design Build Fellow - Will Koning - Grant Johnson - Brittany Goldsmith - Matt Rivera - Brian Duncan - Ben Ludeman - Jillian Pate - Taylor Carlisle - Marc Daubert