With the vision to pair history and technology aside experience and workforce education, the design build teams achieved zero energy, redacted carbon, employed non-toxic natural materials, granted morning winter light, anticipated renovations, eased the future installation of solar and electric vehicles, and protected wetlands through on-site stormwater infiltration. PROJECT METRICS | Heating Demand 5.93 kBTU/ft²yr Cooling Demand 2.78 kBTU/ft²yr Peak Heating Load 3.69 BTU/ft²hr Peak Cooling Load 1.57 BTU/ft²hr Zero Source Energy Site Energy 9.57 kBTU/ft²yr Airtightness 0.056 cfm50/ft² EUI 9.57 (-0.52 w/ renewables) HERS Score 57 TEAM | DESIGNER | MANAGER | PASSIVE HOUSE CONSULTANT SANDERSON SUSTAINABLE DESIGN SANDERSONDESIGN.NET
Architect of Record
RE:VISION ARCHITECTURE REVISIONARCH.COM GENERAL CONTRACTOR CUSTOM RESIDENTIAL CONSTRUCTIONS CRCONSTRUCTIONS.COM HIGH PERFORMANCE +
Timber Framing Hugh Lofting
HUGHLOFTINGTIMBERFRAME.COM
Prefabrication Coordination Holzraum System
HOLZRAUMSYSTEM.COM
Panel Manufacturing Blueprint Robotics
BLUEPRINT-ROBOTICS.COM SYSTEMS ENGINEER J & M ENGINEERING JANDMENGINEERS.COM
Structural Engineer Cks Structures
CKSSTRUCTURES.COM
Civil Engineer Protract Engineering
PROTRACT.NET
Landscape Architects Thinkgreen Llc
THINKGREENLLC.COM